The results show that the settlement will occur during the construction at the upper levels and the end of construction at the middle levels of the dam. The outcomes of instrumentation and numerical analysis at the end of Marvak dam construction showed a settlement between 20 and 500 mm. Numerical modeling of the dam has been done considering the actual embankment conditions and to analyze the changes of the immediate settlement during construction and the consolidation settlement just after construction and initial impounding. Also, the largest and most critical section of the Marvak earth dam is modeled with the behavioral model of the Mohr–Coulomb by GeoStudio software. In the present study, using instrumentation data regarding vertical and horizontal displacement of the dam have been analyzed.